DET-04 · L12A-1A-2A-3A-4EL +0.00SHEET 04 / 12

Emergency
Rebar Detailing

48-hour rebar shop drawings and BBS. For teams that can’t miss a deadline.

Need urgent rebar drawings? Get a callback in 15 minutes.
What we do · 01

Emergency rebar detailing.

T+48H · EMERGENCY
BBS · IFC · RVT · PDF
FIG. 0.1   48 H DELIVERY
01
48 hours, file to delivery
From IFC, Revit, or PDF to shop drawings and BBS.
FIG. 0.2   DIRECT FLOW
02
Single-package scope
Shop drawings and BBS only. No project management.
FIG. 0.3   FILE FORMATS
03
BIM-compatible
Revit, AutoCAD, IFC.
NEXT — START YOUR URGENT PROJECT
Why us · 02

What we put in writing.

ACI 318 · EUROCODE 2 · IS 456
CL. 4.1 · SLA 48H
CAPABILITY
NOTE
STANDARD
01
Single-package focus
We do shop drawings and BBS. Nothing else.
SCOPE — LOCKED
02
Written rework policy
Free reworks within 3 months of delivery.
3 MONTHS · NO QUESTIONS
03
Direct line to detailers
No account managers in between.
DETAILER → YOU
04
Standards-aware
Drawings produced to your standards reference.
ACI 318 · EC 2 · IS 456
GUARANTEE
Try us. If we’re late, you don’t pay.
CL. 4.1
SLA · 48 H
How it works · 03

How emergency detailing works.

T+0H → T+24H → T+48H
3 STEPS · SAME-DAY START
T + 0 H
01
Send your files.
IFC, Revit, PDF. We accept whatever you have.
T + 24 H
02
We detail and dispatch.
Your project starts the same day.
T + 48 H
03
You receive shop drawings and BBS.
Within 48 hours.
NEXT — START YOUR URGENT PROJECT